Generation at Maximum Demand total of Previous Day 456 MW | Notice of Viva Exam for the post of Manager (Procurement) and DM (Audit). Generation at Maximum Demand total of Previous Day 456 MW | Written Exam Routine
Company Profile
Corporate Office : Ashuganj Power Station Company Ltd., Ashuganj, Brahmanbaria, 3402
Registration No. : C-40630 (2328)/2000
Date of Incorporation : 28 June 2000
Status : Public Limited Company
Business : Power Generation
Number of Generating Units : 9 (6 Steam Turbine + 2 Gas Turbine+ 1 Gas Engine)
: Two Steam Units of 64MW- Unit # 1 & 2 each-commissioned in 1970.
: Gas Turbine Units-GT1 and GT2 of capacity 56MW each-commissioned in 1982 and
  1986 respectively
: One Steam Turbine (ST) of capacity 34MW with waste heat recovery Boiler
  commissioned in 1984.
: Unit # 3 of 150MW capacity was commissioned in 1986
: Unit # 4 of 150MW capacity was commissioned in 1987.
: Unit # 5 of 150MW capacity was commissioned in 1988.
: 50MW Gas Engine Power Plant was commissioned in 2011
Installed Capacity : 777MW
Present de-rated capacity : 731 MW
Area of Land : 263.55 Acres
Company Website : www.apscl.com
E-mail : apscl@apscl.com, apsclbd@yahoo.com
Downloads
APSCL Power Generation Master Plan
APSCL Power Generation Master Plan 2012
Ashuganj 450MW CCPP (North) Project
Resettlement Plan of Ashuganj 450 MW CCPP (North) Project
Invitation for Bids of Ashuganj 450MW CCPP (North) Project
Bid Document Vol. 1 of 3
Bid Document Vol. 3 of 3
Bid Document Vol. 2 of 3
Meeting minutes of Pre-Bid Meeting.
Site Layout of Ashuganj 450MW (North) and (South) Projects
Amendment-1 of 450 MW CCPP (North)
230kV GIS- North Scope
Bathymetric survey report of Meghna River.
Soil Investigation Report of North Project Site.
North layout and plot plan.
APSCL site.
APSCL topographic map.
Amendment-2 of 450MW CCPP (North)
Draft Grid Code of Bangladesh
Training Program
Training Schedule- 2012-2013
Job
Recent Event

19-May-2013
Notice of Viva Exam for the post of Manager (Procurement) and DM (Audit).

06-May-2013
Written Exam Routine