1. Patuakhali 2x660 MW Ultra-Super Critical Coal Fired Power Plant Project. | |
Project Highlights: 
Objective: 
a. To narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country.
Present Status : 
| |
2. 100MW Grid Tied Solar Park | |
Project Highlights: 
Objective: 
Present Status : 
| |
3. 400 MW Dual Fuel Combined Cycle Power Plant at Ashuganj (By replacing Unit 1 & 2). | |
Project Highlights: 
Objective: 
Present Status : 
| |
4. 2x660 North-Bengal Coal Fired Thermal Power Plant. | |
Project Highlights: 
Objective: 
a. To narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country.
Present Status : 
| |
5. 200 MW Solar Park at Padma Char in Rajshahi. | |
Project Highlights: 
Objective: 
Present Status : 
Feasibility Study is going on. | |
Foreign Tour/Training
Information Memorandum_ Ashuganj Power Station Company Limited's non convertible, fully reedemable coupon bearing bond
Integrity
Land Acquisition, Land Development and Protection for Patuakhali 1320 MW Super Thermal Power Plant project.
100 MW Grid Tied Solar Park Project
Ashuganj 400MW CCPP (East) Project
NOC
Training Program
Easy Utility Service
Upload : 29-06-2019
Upload : 28-12-2017
Upload : 28-12-2017
Upload : 22-06-2017
Dual Fuel Based CCPP
North-Bengal Coal Fired Thermal Power Plant
Achievement of Present Government in Power Sector.
APSCL Power Generation Master Plan
! Notice not available...