Upcoming Projects

1. 100MW Grid Tied Solar Park
Project Highlights:  
Objective:  
Present Status :  
  • Searching of land is going on.
  • Document Preparation for Consultancy Services for Feasibility Study is going on.

2. 2x660 North-Bengal Coal Fired Thermal Power Plant.
Project Highlights:  
Objective:  

a. To narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country.
b. To meet up increasing power demand in the country by adding local generation.
c. To increase the power generation of the country through utilization of countrys natural gas resources available nearest to the proposed power plant site with requisite pressure.
d. To accelerate the economic development of the country by adequate and reliable power generation and to support the planed target of power demand.
e. To overcome the present generation shortage by increasing generation and to minimize load shedding.
f. To enhance the stability and reliability of the national grid system and reduce the transmission loss by local generation.
g. To increase energy efficiency of power generation.

Present Status :  
  • EOI Notice of Consultancy services for pre-feasibility study & IEE has been published.

3. Patuakhali 1320 MW Super Thermal Power Plant.
Project Highlights:  
Objective:  

a. To narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country.
b. To meet up increasing power demand in the country by adding local generation.
c. To increase the power generation of the country through utilization of countrys natural gas resources available nearest to the proposed power plant site with requisite pressure.
d. To accelerate the economic development of the country by adequate and reliable power generation and to support the planed target of power demand.
e. To overcome the present generation shortage by increasing generation and to minimize load shedding.
f. To enhance the stability and reliability of the national grid system and reduce the transmission loss by local generation.
g. To increase energy efficiency of power generation.

Present Status :  
  • Site has been selected at Debpur, Patuakhali, and Barisal.
  • Land Acquisition process is going.
  • DPP for Land Acquisition, Land Development & Protection has been sent to Ministry.

 

4. Ashuganj 400MW CCPP (East) Project
Project Highlights:  

Combined cycle Power plant to effective & efficient utilization of natural gas by replacing of old inefficient power plant. It will narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country It will accelerate to meet the vision of the Government i.e. to ensure quality power for all in 2021.

Objective:  

a. To narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country.
b. To meet up increasing power demand in the country by adding local generation.
c. To increase the power generation of the country through utilization of countrys natural gas resources available nearest to the proposed power plant site with requisite pressure.
d. To accelerate the economic development of the country by adequate and reliable power generation and to support the planed target of power demand.
e. To overcome the present generation shortage by increasing generation and to minimize load shedding.
f. To enhance the stability and reliability of the national grid system and reduce the transmission loss by local generation.
g. To increase energy efficiency of power generation.

Present Status :  

a. International Tender Notice (1st Stage) published in international newspaper on 12th May 2016 for the selection of EPC contractor.

b. On 17th August 2016, total 21 (Twenty one) Bids received from Bidders. Technical Bid Evaluation Report (1st Stage) was sent to ADB on last 15th Feb 2017. ADB submitted their comments on 17th March 2017. Revised Technical Bid Evaluation Report preparation is going on.   

c. Contract signed with M/S Poyry Switzerland Ltd, Switzerland & Atlanta Enterprise Limited, Bangladesh for Project Implementation Consultancy Service on last 29th March 2017.