Generation at Maximum Demand total of Previous Day 545 MW | Written Exam result and schedule of Viva Exam for the post of Manager (Health, Safety and Environment) and Asstt. Manager (MIS & ICT) Generation at Maximum Demand total of Previous Day 545 MW | Notice of Written exam for the post Apprentice (Technical) Freedom-Fighter Quota.
Download >>
Sl. Title Download
Downloads
APSCL Power Generation Master Plan
APSCL Power Generation Master Plan 2012
Ashuganj 450MW CCPP (North) Project
Resettlement Plan of Ashuganj 450 MW CCPP (North) Project
Invitation for Bids of Ashuganj 450MW CCPP (North) Project
Bid Document Vol. 1 of 3
Bid Document Vol. 3 of 3
Bid Document Vol. 2 of 3
Meeting minutes of Pre-Bid Meeting.
Site Layout of Ashuganj 450MW (North) and (South) Projects
Amendment-1 of 450 MW CCPP (North)
230kV GIS- North Scope
Bathymetric survey report of Meghna River.
Soil Investigation Report of North Project Site.
North layout and plot plan.
APSCL site.
APSCL topographic map.
Amendment-2 of 450MW CCPP (North)
Draft Grid Code of Bangladesh
Training Program
Training Schedule- 2012-2013
Job
Application Form for the Post of Secretary and Asstt Secretary.
Recent Event

12-Jun-2013
Written Exam result and schedule of Viva Exam for the post of Manager (Health, Safety and Environment) and Asstt. Manager (MIS & ICT)

08-Jun-2013
Notice of Written exam for the post Apprentice (Technical) Freedom-Fighter Quota.